Systems that control the environment in a building change with time and use, and must be rebalanced accordingly. The designer must consider initial and supplementary testing and balancing requirements for commissioning. Complete and accurate operating and maintenance instructions that include intent of design and how to test, adjust, and balance the building systems are essential. Building operating personnel must be well-trained, or qualified operating service organizations must be employed to ensure optimum comfort, proper process operations, and economical operation.
Chapter Table of Contents
Terminology
General Criteria
Air Volumetric Measurement Methods
Balancing Procedures for Air Distribution
Variable-Volume Systems
Principles and Procedures for Balancing Hydronic Systems
Water-Side Balancing
Hydronic Balancing Methods
Fluid Flow Measurement
Steam Distribution
Cooling Towers
Temperature Control Verification
Field Survey for Energy Audit
Reports
Testing for Sound and Vibration
Citation: 2011 ASHRAE Handbook -- HVAC Applications: Chapter 38, Testing, Adjusting, and Balancing