AWWA WQTC71505

AWWA WQTC71505 Optimizing Arsenic Removal Water Treatment Plants to Perform as Efficiently as Pilot Testing

Conference Proceeding published 11/01/2009 by American Water Works Association

Written By Stratton, Richard

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.08 tax incl.

$24.00 tax incl.

(price reduced by 58 %)

Full Description

This powerpoint presentation begins by providing a brief overview of the Isleton and Walnut Grove water systems. The steps taken to comply with the U.S. Environmental Protection Agency's (USEPA's)new arsenic standard (10 g/L MCL) are listed, along with improvements to Walnut Grove's 300gpm direct filtration plant and to Isleton's 500 gpm direct filtration plant. Project results are provided, along with a comparison of pilot testing and full scale operating conditions at Isleton, a strategy to address performance challenges of the pilot study, arsenic removal optimizationstrategies for walnut grove and for Isleton. Includes table, figure.

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out