AWWA DSS63721

AWWA DSS63721 IDSE Compliant Hydraulic Models Deliver More Than Stage 2 DBP Rule Compliance

Conference Proceeding published 09/01/2006 by American Water Works Association

Written By Davis, Stephen K.; Murphy, Brian M.

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$10.08 tax incl.

$24.00 tax incl.

(price reduced by 58 %)

Full Description

Stage 2 of the Disinfection Byproduct Rule (DBPR) is designed to further reduceexposure to disinfection byproducts (DBP) in drinking water. The first step requiredunder the Stage 2 DBPR is completion of an Initial Distribution System Evaluation(IDSE). The purpose of the IDSE is to identify those locations within the distributionsystem where DBP concentrations are anticipated to be the highest. These representativelocations will then become the long-term compliance monitoring points.This paper discusses the sampling-based and hydraulic modeling-based methods bywhich the IDSE can be accomplished and highlight the additional benefits which can beexpected through the use of an IDSE compliant hydraulic model. Includes tables.

Cart

No products

Shipping $0.00
Total $0.00

Cart Check out

Specials

All specials